

Call us: +34 645 695 356
Part Number: 24.981
Plazo de entrega de este artículo 3 semanas.
Security policy
Shipping terms
Return policy
Plazo de entrega de este artículo 3 semanas.
Plazo de entrega de este artículo 3 semanas.
Presión 2,5-20 bar.
Mínimo 5l/min.
Delivery time of this article 3 weeks.
Mosmatic wash ramp for trucks
It requires a high flow rate (10 liters per nozzle) and an average pressure between 80 and 110 Bar.
Adjustable in height and angle.
High impact at a distance.
Plazo de entrega de este artículo 3 semanas.
Delivery time of this article 3 weeks.
This article requires to order 4 nozzles 1/8 separately.
Delivery time for this item 3 weeks.
Equipped with nozzles stabilizer.
Requires 4 nozzles, EG in accordance with the flow rate of the pump.
Multiple installation options.
Spray is easily adjustable.
Delivery time of this article 3 weeks.
Double Mosmatic wash ramp for trucks
It requires a high flow rate (10 liters per nozzle) and an average pressure between 80 and 110 Bar.
Adjustable in height and angle.
High impact at a distance.
Plazo de entrega de este artículo 3 semanas.